Everything from the pump to the end plug can be provided to make the most efficient system to use with the lowest labor costs and maximum hydraulic performance so the ore receives the designed solution application throughout the entire leach pad.
It is our desire to provide the system which will result in actual extraction equal to the predicted mine design performance.
-
1
1. Maximum metal extraction from your ore.
-
2
2. Lowest cost system per heap leach cycle.
-
3
3. Optimum system hydraulics for maximum system performance.
-
4
4. Equal Application of Solution at every location across the heap.
-
5
5. Low labor costs to operate by providing components which are easy to use.
-
6
6. Long life components with minimum down time and maintenance costs
-
7
7. Low design costs
-
8
8. Good service from the most experienced technical service team in the industry.